The Tobin Center for Performing Arts is a historic building built on San Antonio’s Riverwalk. Much of the structure was demolished to be replaced with a more modern auditorium, but the external façade, entrance, and public circulation areas kept intact. IKERD worked for General Contractor Linbeck to laser scan and 3D model the remaining parts of the structure so that the new building could be attached accurately to the old façade.